Working closely with West Lindsey District Council, Universal Coatings removed and refurbished the Saxilby footbridge at our facilities in Misterton which included Shotblasting to remove existing paint, Carrying out steel repairs and Re-Blasting to achieve Sa2½ (BS EN ISO 8501-1) blast standard before applying a M24 Paint specification, Universal coatings then delivered and installed the bridge back over the Fossdyke canal in Saxilby.
top of page
bottom of page
Comments